325 repair operators trained since 2018
Accumulated 5400 hours of training executed
7 vehicle brochures published
Covered over 6 Valencia Plant launches:
2018 Transit Connect Facelift
2018 S-Max and Galaxy Biturbo Panther engines and FHEV
2019 All new Kuga PHEV and FHEV
2020 S-Max FHEV
Quick find: simulation to overlay electrical distribution components layout over real time vehicle. Executable on iOS and Android device. 60 people trained and shared to production team for daily usage.
Virtual E-flow: layout and recovery on hybrid vehicle system depending on driver inputs. Enhance and train HEV operation behind the steering wheel. 60 people trained.
Three work benches prior to launch phase exclusively for EOL validation and test readiness. Besides, we can account for 125 engineers receiving a 32-hour training program taking advantage of those work benches 24/7.
25 TSI-personel trained on specific 30h course on high voltage safety
60 detailed step-by-step quality instruction procedures developed
43 items as quality checklist confirmed by TSE quality auditors
Regular training plan in place to expand and electrify plant teams.
Revision and compliance on new FAS08-163 safety standard.
115 L1 certified people trained
25 trainees on L2 specialist in intrinsically safe electrified vehicles.